toggle visibility Search & Display Options

Select All    Deselect All
 |   | 
Details
   print
  Records Links
Author openurl 
  Title (down) World first: Full-scale BioSure plant commissioned Type Journal Article
  Year 2006 Publication Water Wheel Abbreviated Journal  
  Volume 5 Issue 3 Pages 19-21  
  Keywords Waste Management and Pollution Policy geographical abstracts: human geography environmental planning (70 11 5) wastewater waste facility mine waste gold mine sewage treatment  
  Abstract ERWAT's Ancor Wastewater Treatment Works on the Far East Rand commissioned a 10 Ml/day full-scale plant to treat toxic mine-water from the Grootvlei gold mine using primary sewage sludge. The R15-million plant is treating sulphate rich acid mine drainage using the Rhodes BioSURE Process. First, the pumped mine-water is treated at a high-density separation (HDS) plant to remove iron and condition pH levels. Then it is pumped two km via a newly-constructed 10 Ml capacity pipeline to the Ancor works. This mine-water is then mixed together with primary sewage sludge in a mixing tank from where a splitter box directs the material to eight biological sulphate reducing reactors or bioreactors. The overflow water which is rich in sulphide is pumped through the main pump station to another mixing box. Here, iron slurry is mixed with the material before it is again divided between four reactor clarifiers for sulphide removal. The overflow water, now containing reduced sulphate levels and virtually no sulphide is pumped to Ancor's biofilters for removal of remaining Chemical Oxygen Demand (COD) and ammonia following the conventional sewage treatment process for eventual release into the Blesbokspruit.  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 0258-2244 ISBN Medium  
  Area Expedition Conference  
  Notes Trade-; World first: Full-scale BioSure plant commissioned; 2865725; South-Africa; Geobase Approved no  
  Call Number CBU @ c.wolke @ 17495 Serial 494  
Permanent link to this record
 

 
Author Robinson, J.D.F. openurl 
  Title (down) Wetland treatment of coal-mine drainage Type Journal Article
  Year 1998 Publication Coal International Abbreviated Journal  
  Volume 246 Issue 3 Pages 114-115  
  Keywords coal mines; Europe; mine drainage; mines; pH; pollution; UK Coal Authority; United Kingdom; water; water treatment; Western Europe; wetlands 22, Environmental geology  
  Abstract  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 1357-6941 ISBN Medium  
  Area Expedition Conference  
  Notes Wetland treatment of coal-mine drainage; 2000-013457; References: 1; illus. incl. 2 tables United Kingdom (GBR); GeoRef; English Approved no  
  Call Number CBU @ c.wolke @ 6129 Serial 260  
Permanent link to this record
 

 
Author Davies, G.J.; Holmes, M.; Wireman, M.; King, K.; Gertson, J.N.; Stefanic, J.M. openurl 
  Title (down) Water tracing at scales of hours to decades as an aid to estimating hydraulic characteristics of the Leadville Mine drainage tunnel Type Journal Article
  Year 2001 Publication Abbreviated Journal  
  Volume Issue Pages  
  Keywords acid mine drainage Arkansas River Colorado drainage dye tracers field studies fluorescence ground water Lake County Colorado Leadville Mine Leadville mining district pH quantitative analysis recharge surveys tunnels United States water treatment 30 Engineering geology 21 Hydrogeology  
  Abstract The Leadville Mine Drainage Tunnel (LMDT) is a 3.3 kilometer structure that was constructed in the complicated geology of the Leadville mine district in the 1940's. Discharge from the LMDT is impacted by heavy metals and is treated at a plant built in 1992 operated by the United States Bureau of Reclamation. On the surface waste rock and other remnants of the mining operations litter the landscape and this material is exposed to precipitation. As a result of contact with this material, surface water often has pH of less than 3 and its containment and disposal is necessary before it impacts surface drainage and the nearby Arkansas River. Using a borehole drilled into the mine workings the U.S. EPA has devised a plan in which the impacted water is contained on the surface which then can be discharged into the mine workings to discharge from the LMDT and be treated. The percentage of water discharging from the mining district along the drainage tunnel is unknown, and since there is no access, information about the condition of the tunnel with regards to blockages is also relatively obscure. Application of quantitative water tracing using fluorescent dyes was used to model the flow parameters at the scale of hours in the tunnel and evaluate the likelihood of blockages. Because the tunnel has intersected several lithologies and faults, other locations such as discharging shafts, adits and surface streams that could be hydraulically connected to the LMDT were also monitored. An initial tracer experiment was done using an instantaneous injection, which was followed by additional injections of water. Another tracer injection was done when there was a continuous flow of impacted water into the workings. Analysis of the tracer concentration responses at water-filled shafts and at the portal were used to model the flow along the tunnel and estimate several hydraulic parameters. Waters in these settings are mixtures of components with different residence times, so, qualitative tritium data were used to evaluate residence times of decades. The combined injected tracer and tritium data as well as other geochemical data were used to infer the nature of flow and recharge into the tunnel.  
  Address  
  Corporate Author Thesis  
  Publisher Abstracts with Programs - Geological Society of America Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Series Title Geological Society of America, 2001 annual meeting Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN ISBN Medium  
  Area Expedition Conference  
  Notes 2004-013418; Geological Society of America, 2001 annual meeting, Boston, MA, United States, Nov. 1-10, 2001; GeoRef; English Approved no  
  Call Number CBU @ c.wolke @ 16511 Serial 408  
Permanent link to this record
 

 
Author Weeks, R.E.; Krohn, R.; Walker, T.H. openurl 
  Title (down) Water management during the Pinto Valley removal action Type Conference Article
  Year 2000 Publication Tailings and Mine and Waste 2000, Proceedings of the Seventh International Conference, Fort Collins, US, Jan 22 26, 2000 Abbreviated Journal  
  Volume Issue Pages 499-506  
  Keywords Bergbau Erzbergbau Erzaufbereitung Damm Gewässerschutz Umweltschutz Grundwasser Rekultivierung Versatzgut Abtragen Niederschlag=Atmosphäre Dammbruch Wassermanagement  
  Abstract Der Bruch des Dammes einer Halde der Grube Nr. 14 des Kupfer- Bergbaubetriebes Pinto Valley in Arizona, USA, im Jahre 1997 führte zum Eintrag von 370000 yd(exp 3) Bergematerials und Tailings in das Bett des Flusses Pinto Creek, USA, wodurch letzteres blockiert wurde. Der Vorfall ereignete sich in bergigem Gelände unterhalb eines 14 Quadratmeilen großen Abschnittes des Flusseinzugsgebietes oberhalb des Sees Roosevelt Lake, USA, einer Trinkwasserquelle für Phoenix, USA. Aufgrund der Bedeutung des Gebietes wurde eine Strategie zur Verhütung weiterer Beeinträchtigungen der Wasserqualität ausgearbeitet. Diese beinhaltete Managementaspekte zur Gewährleistung einer schnellen Planung und Ausführung der notwendigen Arbeiten gekoppelt mit der Planung, dem Bau und dem Betrieb von Rückhalte und Umleitungssystemen für auftretende Wässer. Die Auslegung dieser Systeme erfolgte auf der Grundlage der Daten des Einzugsgebietes und der klimatischen Verhältnisse, wobei verschiedene Wahrscheinlichkeiten der Überschreitung der ermittelten Werte berücksichtigt wurden. Innerhalb von acht Monaten konnten die Tailings aus dem betroffenen Gebiet entfernt werden, ohne dass belastete Oberflächenwässer freigesetzt wurden.  
  Address Golder Associates, Phoenix, US; BHP Copper, Miami, US; AGRA Earth & Environmental, Phoenix, US  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN ISBN Medium  
  Area Expedition Conference  
  Notes Water management during the Pinto Valley removal action; BERG, Copyright FIZ Technik e.V.; EN Englisch; 90-5809-126-0; 200007 03261; 22520, BERG , 25.09.00; Words: 374; 8 Seiten, 1 Bild, 3 Quellen 3MZ *Bergbau, Tunnelbau, Erdöl /Erdgasförderung, Bohrtechnik* 3UX *Umweltbelastung, technik* Approved no  
  Call Number CBU @ c.wolke @ 17593 Serial 215  
Permanent link to this record
 

 
Author LaPointe, F.; Fytas, K.; McConchie, D. url  openurl
  Title (down) Using permeable reactive barriers for the treatment of acid rock drainage Type Journal Article
  Year 2005 Publication International journal of surface mining, reclamation and environment Abbreviated Journal  
  Volume 19 Issue 1 Pages 57-65  
  Keywords Pollution and waste management non radioactive Groundwater problems and environmental effects geological abstracts: environmental geology (72 14 2) geomechanics abstracts: excavations (77 10 10) waste management remediation mining industry pollution control acid mine drainage reactive barrier aluminium industry effluents industrial waste mineral processing industry oxidation waste handling permeable reactive barriers acid rock drainage treatment acid mine drainage environmental problem Canadian mineral industry oxidation sulphide minerals mine waste mine tailings heavy metals acid remediation technology metallurgical residues aluminium extraction industry acid mine effluents Manufacturing and Production acid mine drainage Bauxsol Canada disposal barriers effluents experimental studies heavy metals instruments oxidation permeable reactive barriers pollutants pollution pyrite pyrrhotite remediation sulfides tailings waste disposal waste management  
  Abstract Acid mine drainage (AMD) is the most serious environmental problem facing the Canadian mineral industry today. It results from oxidation of sulphide minerals (e.g. pyrite or pyrrhotite) contained in mine waste or mine tailings and is characterized by acid effluents rich in heavy metals that are released into the environment. A new acid remediation technology is presented, by which metallurgical residues from the aluminium extraction industry are used to construct permeable reactive barriers (PRBs) to treat acid mine effluents. This technology is very promising for treating acid mine effluents in order to decrease their harmful environmental effects  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 1389-5265 ISBN Medium  
  Area Expedition Conference  
  Notes Using permeable reactive barriers for the treatment of acid rock drainage; 8467608; Journal Paper; SilverPlatter; Ovid Technologies Approved no  
  Call Number CBU @ c.wolke @ 16786 Serial 12  
Permanent link to this record
Select All    Deselect All
 |   | 
Details
   print

Save Citations:
Export Records: