|
Records |
Links |
|
Author |
Davies, G.J.; Holmes, M.; Wireman, M.; King, K.; Gertson, J.N.; Stefanic, J.M. |
|
|
Title ![sorted by Title field, ascending order (up)](img/sort_asc.gif) |
Water tracing at scales of hours to decades as an aid to estimating hydraulic characteristics of the Leadville Mine drainage tunnel |
Type |
Journal Article |
|
Year |
2001 |
Publication |
|
Abbreviated Journal |
|
|
|
Volume |
|
Issue |
|
Pages |
|
|
|
Keywords |
acid mine drainage Arkansas River Colorado drainage dye tracers field studies fluorescence ground water Lake County Colorado Leadville Mine Leadville mining district pH quantitative analysis recharge surveys tunnels United States water treatment 30 Engineering geology 21 Hydrogeology |
|
|
Abstract |
The Leadville Mine Drainage Tunnel (LMDT) is a 3.3 kilometer structure that was constructed in the complicated geology of the Leadville mine district in the 1940's. Discharge from the LMDT is impacted by heavy metals and is treated at a plant built in 1992 operated by the United States Bureau of Reclamation. On the surface waste rock and other remnants of the mining operations litter the landscape and this material is exposed to precipitation. As a result of contact with this material, surface water often has pH of less than 3 and its containment and disposal is necessary before it impacts surface drainage and the nearby Arkansas River. Using a borehole drilled into the mine workings the U.S. EPA has devised a plan in which the impacted water is contained on the surface which then can be discharged into the mine workings to discharge from the LMDT and be treated. The percentage of water discharging from the mining district along the drainage tunnel is unknown, and since there is no access, information about the condition of the tunnel with regards to blockages is also relatively obscure. Application of quantitative water tracing using fluorescent dyes was used to model the flow parameters at the scale of hours in the tunnel and evaluate the likelihood of blockages. Because the tunnel has intersected several lithologies and faults, other locations such as discharging shafts, adits and surface streams that could be hydraulically connected to the LMDT were also monitored. An initial tracer experiment was done using an instantaneous injection, which was followed by additional injections of water. Another tracer injection was done when there was a continuous flow of impacted water into the workings. Analysis of the tracer concentration responses at water-filled shafts and at the portal were used to model the flow along the tunnel and estimate several hydraulic parameters. Waters in these settings are mixtures of components with different residence times, so, qualitative tritium data were used to evaluate residence times of decades. The combined injected tracer and tritium data as well as other geochemical data were used to infer the nature of flow and recharge into the tunnel. |
|
|
Address |
|
|
|
Corporate Author |
|
Thesis |
|
|
|
Publisher |
Abstracts with Programs - Geological Society of America |
Place of Publication |
|
Editor |
|
|
|
Language |
|
Summary Language |
|
Original Title |
|
|
|
Series Editor |
|
Series Title |
Geological Society of America, 2001 annual meeting |
Abbreviated Series Title |
|
|
|
Series Volume |
|
Series Issue |
|
Edition |
|
|
|
ISSN |
|
ISBN |
|
Medium |
|
|
|
Area |
|
Expedition |
|
Conference |
|
|
|
Notes |
2004-013418; Geological Society of America, 2001 annual meeting, Boston, MA, United States, Nov. 1-10, 2001; GeoRef; English |
Approved |
no |
|
|
Call Number |
CBU @ c.wolke @ 16511 |
Serial |
408 |
|
Permanent link to this record |
|
|
|
|
Author |
Robinson, J.D.F. |
|
|
Title ![sorted by Title field, ascending order (up)](img/sort_asc.gif) |
Wetland treatment of coal-mine drainage |
Type |
Journal Article |
|
Year |
1998 |
Publication |
Coal International |
Abbreviated Journal |
|
|
|
Volume |
246 |
Issue |
3 |
Pages |
114-115 |
|
|
Keywords |
coal mines; Europe; mine drainage; mines; pH; pollution; UK Coal Authority; United Kingdom; water; water treatment; Western Europe; wetlands 22, Environmental geology |
|
|
Abstract |
|
|
|
Address |
|
|
|
Corporate Author |
|
Thesis |
|
|
|
Publisher |
|
Place of Publication |
|
Editor |
|
|
|
Language |
|
Summary Language |
|
Original Title |
|
|
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
|
|
Series Volume |
|
Series Issue |
|
Edition |
|
|
|
ISSN |
1357-6941 |
ISBN |
|
Medium |
|
|
|
Area |
|
Expedition |
|
Conference |
|
|
|
Notes |
Wetland treatment of coal-mine drainage; 2000-013457; References: 1; illus. incl. 2 tables United Kingdom (GBR); GeoRef; English |
Approved |
no |
|
|
Call Number |
CBU @ c.wolke @ 6129 |
Serial |
260 |
|
Permanent link to this record |
|
|
|
|
Author |
|
|
|
Title ![sorted by Title field, ascending order (up)](img/sort_asc.gif) |
World first: Full-scale BioSure plant commissioned |
Type |
Journal Article |
|
Year |
2006 |
Publication |
Water Wheel |
Abbreviated Journal |
|
|
|
Volume |
5 |
Issue |
3 |
Pages |
19-21 |
|
|
Keywords |
Waste Management and Pollution Policy geographical abstracts: human geography environmental planning (70 11 5) wastewater waste facility mine waste gold mine sewage treatment |
|
|
Abstract |
ERWAT's Ancor Wastewater Treatment Works on the Far East Rand commissioned a 10 Ml/day full-scale plant to treat toxic mine-water from the Grootvlei gold mine using primary sewage sludge. The R15-million plant is treating sulphate rich acid mine drainage using the Rhodes BioSURE Process. First, the pumped mine-water is treated at a high-density separation (HDS) plant to remove iron and condition pH levels. Then it is pumped two km via a newly-constructed 10 Ml capacity pipeline to the Ancor works. This mine-water is then mixed together with primary sewage sludge in a mixing tank from where a splitter box directs the material to eight biological sulphate reducing reactors or bioreactors. The overflow water which is rich in sulphide is pumped through the main pump station to another mixing box. Here, iron slurry is mixed with the material before it is again divided between four reactor clarifiers for sulphide removal. The overflow water, now containing reduced sulphate levels and virtually no sulphide is pumped to Ancor's biofilters for removal of remaining Chemical Oxygen Demand (COD) and ammonia following the conventional sewage treatment process for eventual release into the Blesbokspruit. |
|
|
Address |
|
|
|
Corporate Author |
|
Thesis |
|
|
|
Publisher |
|
Place of Publication |
|
Editor |
|
|
|
Language |
|
Summary Language |
|
Original Title |
|
|
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
|
|
Series Volume |
|
Series Issue |
|
Edition |
|
|
|
ISSN |
0258-2244 |
ISBN |
|
Medium |
|
|
|
Area |
|
Expedition |
|
Conference |
|
|
|
Notes |
Trade-; World first: Full-scale BioSure plant commissioned; 2865725; South-Africa; Geobase |
Approved |
no |
|
|
Call Number |
CBU @ c.wolke @ 17495 |
Serial |
494 |
|
Permanent link to this record |