|
Records |
Links |
|
Author |
Henderson, A. |
![find record details (via OpenURL) openurl](img/xref.gif)
|
|
Title ![sorted by Title field, ascending order (up)](img/sort_asc.gif) |
The implementation of paste fill at the Henty Gold Mine |
Type |
Journal Article |
|
Year |
1998 |
Publication |
Minefill'98 |
Abbreviated Journal |
|
|
|
Volume |
98 |
Issue |
1 |
Pages |
299-304 |
|
|
Keywords |
mine water treatment |
|
|
Abstract |
The Henty Gold Mine, located ill Western Tasmania uses innovative solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several environmental awards. Fill is required as part of the mining method to provide passive ground support, minimise rock exposure and ensure maximum recovery of the small but high-grade orebody. The use of the whole portion of leach residue in the backfill reduces the surface tailing disposal requirements. Therefore, High Density Paste Fill (HDPF) has been selected as the most appropriate fill method to meet these objectives. Additional benefits include the minimisation of excess water from fill and the subsequent need for the collection and treatment of water and slimes. There are minimal equipment requirements during placement, thereby optimising mine resources for production. |
|
|
Address |
|
|
|
Corporate Author |
|
Thesis |
|
|
|
Publisher |
|
Place of Publication |
|
Editor |
|
|
|
Language |
|
Summary Language |
|
Original Title |
|
|
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
|
|
Series Volume |
|
Series Issue |
|
Edition |
|
|
|
ISSN |
|
ISBN |
|
Medium |
|
|
|
Area |
|
Expedition |
|
Conference |
|
|
|
Notes |
The implementation of paste fill at the Henty Gold Mine; Isip:000074225800048; Times Cited: 0; ISI Web of Science |
Approved |
no |
|
|
Call Number |
CBU @ c.wolke @ 17142 |
Serial |
181 |
|
Permanent link to this record |
|
|
|
|
Author |
Gemmell, R.P. |
![find record details (via OpenURL) openurl](img/xref.gif)
|
|
Title ![sorted by Title field, ascending order (up)](img/sort_asc.gif) |
The reclamation of acidic colliery spoil .2. The use of lime wastes |
Type |
Journal Article |
|
Year |
1981 |
Publication |
Journal of Applied Ecology |
Abbreviated Journal |
|
|
|
Volume |
18 |
Issue |
3 |
Pages |
879-887 |
|
|
Keywords |
mine water treatment |
|
|
Abstract |
|
|
|
Address |
|
|
|
Corporate Author |
|
Thesis |
|
|
|
Publisher |
|
Place of Publication |
|
Editor |
|
|
|
Language |
|
Summary Language |
|
Original Title |
|
|
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
|
|
Series Volume |
|
Series Issue |
|
Edition |
|
|
|
ISSN |
|
ISBN |
|
Medium |
|
|
|
Area |
|
Expedition |
|
Conference |
|
|
|
Notes |
The reclamation of acidic colliery spoil .2. The use of lime wastes; Wos:A1981mx25300019; Times Cited: 3; ISI Web of Science |
Approved |
no |
|
|
Call Number |
CBU @ c.wolke @ 9196 |
Serial |
97 |
|
Permanent link to this record |
|
|
|
|
Author |
Costigan, P.A. |
![find record details (via OpenURL) openurl](img/xref.gif)
|
|
Title ![sorted by Title field, ascending order (up)](img/sort_asc.gif) |
The reclamation of acidic colliery spoil .3. Problems associated with the use of high-rates of limestone |
Type |
Journal Article |
|
Year |
1982 |
Publication |
Journal of Applied Ecology |
Abbreviated Journal |
|
|
|
Volume |
19 |
Issue |
1 |
Pages |
193-201 |
|
|
Keywords |
mine water treatment |
|
|
Abstract |
|
|
|
Address |
|
|
|
Corporate Author |
|
Thesis |
|
|
|
Publisher |
|
Place of Publication |
|
Editor |
|
|
|
Language |
|
Summary Language |
|
Original Title |
|
|
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
|
|
Series Volume |
|
Series Issue |
|
Edition |
|
|
|
ISSN |
|
ISBN |
|
Medium |
|
|
|
Area |
|
Expedition |
|
Conference |
|
|
|
Notes |
The reclamation of acidic colliery spoil .3. Problems associated with the use of high-rates of limestone; Wos:A1982nq52600017; Times Cited: 5; ISI Web of Science |
Approved |
no |
|
|
Call Number |
CBU @ c.wolke @ 9185 |
Serial |
96 |
|
Permanent link to this record |
|
|
|
|
Author |
Wiessner, A. |
![find record details (via OpenURL) openurl](img/xref.gif)
|
|
Title ![sorted by Title field, ascending order (up)](img/sort_asc.gif) |
The treatment of a deposited lignite pyrolysis wastewater by adsorption using activated carbon and activated coke |
Type |
Journal Article |
|
Year |
1998 |
Publication |
Colloids and Surfaces a-Physicochemical and Engineering Aspects |
Abbreviated Journal |
|
|
|
Volume |
139 |
Issue |
1 |
Pages |
91-97 |
|
|
Keywords |
mine water treatment |
|
|
Abstract |
To study the functions of activated carbon and activated coke adsorption for the treatment of highly contaminated discolored industrial wastewater with a wide molecular size distribution of organic compounds, the deposited lignite pyrolysis wastewater from a filled open-cast coal mine was used for continuous and discontinuous experiments. |
|
|
Address |
|
|
|
Corporate Author |
|
Thesis |
|
|
|
Publisher |
|
Place of Publication |
|
Editor |
|
|
|
Language |
|
Summary Language |
|
Original Title |
|
|
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
|
|
Series Volume |
|
Series Issue |
|
Edition |
|
|
|
ISSN |
|
ISBN |
|
Medium |
|
|
|
Area |
|
Expedition |
|
Conference |
|
|
|
Notes |
The treatment of a deposited lignite pyrolysis wastewater by adsorption using activated carbon and activated coke; Wos:000074411100012; Times Cited: 1; ISI Web of Science |
Approved |
no |
|
|
Call Number |
CBU @ c.wolke @ 17147 |
Serial |
133 |
|
Permanent link to this record |
|
|
|
|
Author |
Banks, S.B. |
![find record details (via OpenURL) openurl](img/xref.gif)
|
|
Title ![sorted by Title field, ascending order (up)](img/sort_asc.gif) |
The UK coal authority minewater-treatment scheme programme: Performance of operational systems |
Type |
Journal Article |
|
Year |
2003 |
Publication |
Jciwem |
Abbreviated Journal |
|
|
|
Volume |
17 |
Issue |
2 |
Pages |
117-122 |
|
|
Keywords |
mine water treatment |
|
|
Abstract |
This paper summarises the performance of minewater-treatment schemes which are operated under the Coal Authority's National Minewater Treatment Programme. Commonly-used design criteria and performance indicators are briefly discussed, and the performance of wetland systems which are operated by the Coal Authority is reviewed. Most schemes for which data are available remove more than 90% iron, and average area-adjusted iron-removal rates range from 1.5 to 5.5 g Fe/m(2). d. These values, which are based on performance calculations, can be distorted by several factors, including the practice of maximising wetland areas to make best use of available land. Removal rates are limited by influent iron loadings, and area-adjusted iron-removal rates should be used with caution when assessing wetland performance. Sizing criteria for all types of treatment system might be refined if more detailed data become available. |
|
|
Address |
|
|
|
Corporate Author |
|
Thesis |
|
|
|
Publisher |
|
Place of Publication |
|
Editor |
|
|
|
Language |
|
Summary Language |
|
Original Title |
|
|
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
|
|
Series Volume |
|
Series Issue |
|
Edition |
|
|
|
ISSN |
0951-7359 |
ISBN |
|
Medium |
|
|
|
Area |
|
Expedition |
|
Conference |
|
|
|
Notes |
May; The UK coal authority minewater-treatment scheme programme: Performance of operational systems; Wos:000183641000009; Times Cited: 1; file:///C:/Dokumente%20und%20Einstellungen/Stefan/Eigene%20Dateien/Artikel/10018.pdf; ISI Web of Science |
Approved |
no |
|
|
Call Number |
CBU @ c.wolke @ 17457 |
Serial |
9 |
|
Permanent link to this record |