|
Amacher, M. C., Brown, R. W., Kotuby-Amacher, J., & Willis, A. (1993). Adding sodium hydroxide to study metal removal in a stream affected by acid mine drainage. Research Paper, US Department of Agriculture, Forest Service, 465(17).
Abstract: Fisher Creek, a stream affected by acid mine drainage in the Beartooth Mountains of Montana, was studied to determine the extent to which copper (Cu) and zinc (Zn) would be removed from stream water when pH was increased by a pulse of sodium hydroxide (NaOH). Although the pH adjustment study indicated that precipitated Fe(OH) “SUB 3” (am) could rapidly remove Cu and Zn from a stream affected by acid mine drainage, the pH should be maintained in an optimal range (7 to 8.5) to maximize removal by adsorption. -from Authors
|
|
|
Ballard, J. J. (1995). Parametric study for metal ion removal from acid mine water using Rhizopus javanicus. Ph.D. thesis, The University of Montana, Montana Tech, Montana.
|
|
|
Bloom, N. S., Preus, E., Kilner, P. I., von der Geest, E., & Hensman, C. E. (2002). Very efficient removal of toxic metals from acid mine drainage water (Berkeley Pit, Montana) with a recycled alkaline industrial waste product Hardrock mining 2002; issues shaping the industry..
|
|
|
Kingham, N. W., Semenak, R., Powell, G., & Way, S. (2002). Reverse osmosis coupled with chemical precipitation treatment of acid mine leachate at the Basin-Luttrell Pit, Ten Mile Creek Site, Lewis and Clark County, Montana Hardrock mining 2002; issues shaping the industry..
|
|
|
Sanders, F., Rahe, J., Pastor, D., & Anderson, R. (1999). Wetlands treat mine runoff. Civil Engineering, 69(1), 53–55.
Abstract: In the late 1890s, silver, lead and zinc deposits were discovered along the headwaters of the Blackfoot River, northeast of Missoula, Mont. Settlers began mining the metals in earnest, and eventually the mines became known as the Upper Blackfoot Mining Complex (UBMC). Many of the mines were operated long enough to supply metals for World War II weaponry, but after the war the mines were abandoned, and by the 1960s, their orange-tainted runoff began to concern both passersby and state officials. In 1991, the state contacted the current owners of several of those mines-including the Mike Horse and the Anaconda-to negotiate a voluntary cleanup. The American Smelting and Refining Co. (ASARCO) and the Atlantic Richfield Co. (ARCO) agreed to remediate the sites' metal-enriched, moderately to severely acidic drainage, which was discharging into the upper Blackfoot River. As part of effort to reclaim the Mike Horse and Anaconda mines, engineers with McCulley, Frick and Gilman Inc. (MFG), Boulder, Colo., developed an integrated, passive wetland treatment system that will take several years to reach full treatment capacity in the high-elevation environment, but will last for decades. (Constructed and restored wetlands have also been part of the remediation of other UBMC mines, such as the Carbonate and Paymaster mines.) The Mike Horse and Anaconda system, designed to meet National Pollutant Discharge Elimination Systems (NPDES) restrictions, concentrates primarily on zinc and iron and, to a lesser extent, on copper, lead and other metals.
|
|