|   | 
Details
   web
Records
Author Chironis, N.P.
Title Mine-built ponds economically clear acid mine waters Type Journal Article
Year (down) 1987 Publication Coal Age Abbreviated Journal
Volume Issue 1 Pages 58-61
Keywords Biologische-Abwasserreinigung Waessrige-Loesung Industrieabwasser Pflanze Gewaesser Ph-Wert Abwasserbehandlung Saeure Buntmetalle Grubenwasser
Abstract Bestimmte Wasserpflanzen in Teichen können Metalle aus sauren Grubenwässern binden durch Adsorption, Filtration und Einlagerung in Wurzeln und Blättern. Algen und oxydierende Bakterien unterstützen diesen Reinigungsprozeß. Angaben zur Anlage der Teiche: Durchflußkapazität 20 l/min bis 38 l/min, Spülung von 18 m(exp 2) pro 4 l Durchflußmenge, Wasserhöhe 5 cm bis 10 cm, der pH-Wert des austretenden Wassers ist größer als 4,0.
Address
Corporate Author Thesis
Publisher Place of Publication Editor
Language Summary Language Original Title
Series Editor Series Title Abbreviated Series Title
Series Volume Series Issue Edition
ISSN ISBN Medium
Area Expedition Conference
Notes Mine-built ponds economically clear acid mine waters; 316, BERG , 01.01.87; Words: 257; U8712 3772 586; 3 Bilder, 3 Quellen 3UXX *Belastung von Wasser, Wasserreinhaltung, Abwasser* 3UMB *Abfallstoffe, behandlung, vermeidung, verwertung, wirtschaft* 3PZ *Bioverfahrenstechnik, Biotechnologie*; BERG, Copyright FIZ Technik e.V.; EN Englisch Approved no
Call Number CBU @ c.wolke @ 17616 Serial 418
Permanent link to this record
 

 
Author Hause, D.R.; Willison, L.R.
Title Deep Mine Abandonment Sealing and Underground Treatment to Prelude Acid Mine Drainage Type Journal Article
Year (down) 1986 Publication Abbreviated Journal
Volume Issue Pages
Keywords in situ treatment sealing phosphate rock dust mine water acid mine water treatment beach area
Abstract Beth Energy's Mine 105W is located in Barbour County, West Virginia, near Buckhannon. The mine was opened by drifts updip into the Pittsburgh Seam in 1971 and operated until June, 1982. Most of the water which enters Mine 105W percolates down from previously mined areas in the Redstone Seam, Mine 101, which generally lies 38 feet above the Pittsburgh Seam. The quality of this water is good as it enters Mine 105W. While operating, the Mine 105W water was segregated by pumping. The bulk of the water was collected in sumps near the main area of infiltration from the Redstone Seam and was pumped to Gnatty Creek Portal where, because of the quality, it was minimally treated and discharged. The remainder of the water flowed to the original West Portal where it was occasionally treated with lime.
Address
Corporate Author Thesis
Publisher Place of Publication Editor
Language Summary Language Original Title
Series Editor Series Title Proceedings, 7th West Virginia Surface Mine Drainage Task Force Symposium Abbreviated Series Title
Series Volume Series Issue Edition
ISSN ISBN Medium
Area Expedition Conference
Notes 2; als Datei vorhanden 13 Abb.; VORHANDEN | AMD ISI | Wolkersdorfer Approved no
Call Number CBU @ c.wolke @ 17350 Serial 359
Permanent link to this record