|
Swoboda-Colberg, N., Colberg, P., & Smith, J. L. (1994). Constructed vertical flow aerated wetlands.
Abstract: In the report, wetland technology is described in which the main reactive layer is limestone gravel (rather than organic material) which is overlain by a fine gravel filter and soil. The three-year project included laboratory and field studies. Vertical aerated wetlands, simulated by columns, constructed in the field and in the laboratory, were operated during the project. The report presents a summary of results given in previous reports and summaries of results obtained using water from Butte, MT, and field studies at the Rockford Tunnel, near Idaho Springs, CO.
|
|
|
Emerick, J. C., Wildeman, T. R., Cohen, R. R., & Klusman, R. W. (1994). Constructed wetland treatment of acid mine discharge at Idaho Springs, Colorado Guidebook on the geology, history, and surface-water contamination and remediation in the area from Denver to Idaho Springs, Colorado (R. C. Severson, Ed.) (Vol. C 1097).
|
|
|
Wiseman, I. (2002). Constructed wetlands for minewater treatment. Bristol, England: Environment Agency.
|
|
|
Davis, L. K. (1994). Constructed wetlands handbook. In Special Publication – United States. Bureau of Mines, Report: BUMINES-SP-06B-94 (409). Proceedings of the International land reclamation and mine drainage conference and Third international conference on The abatement of acidic drainage; Volume 2 of 4; Mine drainage.
|
|
|
Jarvis, A. P., & Younger, P. L. (1999). Design, construction and performance of a full-scare compost wetland for mine-spoil drainage treatment at quaking houses. Jciwem, 13(5), 313–318.
Abstract: Acidic spoil-heap drainage, containing elevated concentrations of iron, aluminium and manganese, has been polluting the Stanley Burn in County Durham for nearly two decades. Following the success of a pilot-scale wetland (the first application of its kind in Europe), a full-scale wetland was installed. Waste manures and composts have been used as the main substrate which is contained within embankments constructed from compacted pulverized fuel ash. The constructed wetland, which cost less than £20,000 to build, has consistently reduced iron and aluminium concentrations and has markedly lowered the acidity of the drainage. A third phase of activities at the site aims to identify and eliminate pollutant-release 'hot spots' within the spoil.
|
|