|
Plant, J. (2006). Removal of base metals from mine waters using passive treatment processes involving autocatalytic oxidation and adsorption.
|
|
|
Orava, D. A., & Swider, R. C. (1996). Inhibiting acid mine drainage throughout the mine life cycle. CIM Bull., 89(999), 52–56.
Abstract: The technical knowledge and practical experience accumulated by industry and others in abating acid mine drainage (AMD) is being proactively applied at every phase of the mine life cycle. This paper traces the mine life cycle from exploration to post closure monitoring and maintenance, and reviews AMD abatement measures that have become an integral component of exploration and mining activities. Attention is increasingly being given to evaluating AMD potential as part of exploration work, and studies related to project feasibility and design. Mining, mineral processing and waste management options are selected taking into consideration their suitability to inhibit AMD. These inhibition measures are typically committed to in closure plans submitted at the permitting stage. Mines are operated and decommissioned, often progressively, as planned and in accordance with environmental protection policies. Es wird über das Problem der Säurebildung aus sulfidischen Aufbereitungsbergen und taubem Gestein im Verlauf des Existenzzyklus eines Bergwerkes berichtet. In Kanada werden seit etwa 10 Jahren intensive Forschungen für Vorhersage, Kontrolle und Eindämmung von Saürebildungen im Bergbau betrieben. Schwerpunkt ist dabei die sulfidische Oxidation (2FeS2 + 7O2 = 2FeSO4 + 2H2SO4) unter Einwirkung verschiedener physikalischer, geochemischer und biologischer Faktoren. Diese Reaktion führt zu einem Komplex weiterer chemischer Reaktionen unter Bildung von zusätzlicher Säure und Lösung von Metallen. Daraus ergeben sich zwei Hauptmöglichkeiten diesen Prozeß zu steuern: 1. die Sulfidoxidation verhindern, 2. den Oxidationsprozeß verlangsamen. Mit dem heutigen Wissensstand ist es möglich, das Säurebildungspotential von Aufbereitungsbergen zu bestimmen, den Prozeß der Sulfidoxidation von Mineralen unter bestimmten physikalischen, geochemischen und biologischen Bedingungen zu modellieren und die Säurebildung von Aufbereitungsbergen und sulfidischen Gesteinen einzudämmen. Im einzelnen werden Maßnahmen zur Bewertung des Säurebildungspotentials und zur Kontrolle und Reduzierung dieses Prozesses während der Existenzstadien Exploration, Durchführbarkeitsstudie und Genehmigung, Gewinnung und Stillegung eines Bergwerkes erläutert. An Beispielen wird gezeigt, daß bei rechtzeitgem Erkennen des Säurebildungspotentials in der Phase der Exploration Verfahren und Maßnahmen bezüglich Aufbereitung, Umgang mit Aufbereitungsbergen ausgewählt werden können.
|
|
|
Lushnikova, O. Y. (1996). Kompleksirovaniye metodov tamponazha i biolokatsii dlya zashchity podzemnykh vod ot zagryazneniya i istoshcheniya. Combined methods of grouting and biolocation for protection of ground water from pollution and depletion. Izvestiya Vysshikh Uchebnykh Zavedeniy. Gornyy Zhurnal, 1996(12), 49–52.
|
|
|
Janiak, H. (1992). Mine drainage treatment in Polish lignite mining. Mine Water Env., 11(1), 35–44.
Abstract: The paper presents volumes and characteristics of water discharged from some Polish lignite open pit mines and discusses methods for its treatment. Results of research work concerned with increase in mine drainage efficiency by using processes of radiation, flocculation and filtration through a set of bog plants, iknown as grass filter are also discussed
|
|
|
Hause, D. R., & Willison, L. R. (1986). Deep Mine Abandonment Sealing and Underground Treatment to Prelude Acid Mine Drainage.
Abstract: Beth Energy's Mine 105W is located in Barbour County, West Virginia, near Buckhannon. The mine was opened by drifts updip into the Pittsburgh Seam in 1971 and operated until June, 1982. Most of the water which enters Mine 105W percolates down from previously mined areas in the Redstone Seam, Mine 101, which generally lies 38 feet above the Pittsburgh Seam. The quality of this water is good as it enters Mine 105W. While operating, the Mine 105W water was segregated by pumping. The bulk of the water was collected in sumps near the main area of infiltration from the Redstone Seam and was pumped to Gnatty Creek Portal where, because of the quality, it was minimally treated and discharged. The remainder of the water flowed to the original West Portal where it was occasionally treated with lime.
|
|