Bell, A. V., & Nancarrow, D. R. (1974). Salmon and mining in northeastern New Brunswick (a summary of the northeastern New Brunswick mine water quality program). CIM Bull., 67(751), 44–53.
Abstract: It was aimed toward developing solutions to major water quality problems in the base metal mining regions of northeastern New Brunswick and specifically toward insuring that the extremely valuable fishery resources and aquatic environments of the region could be maintained in the face of existing and future base metal mining developments. The program analyzed in detail the fishery resources of the region, their water quality requirements, the mineral resources of the region and the many aspects of mining waste management at each phase of mine development. This paper describes the reasons for the initial concern and the approach adopted toward finding a solution. It briefly summarizes the important findings and recommendations made to support the conclusion that the fishery resource can be maintained and co-exist with current and future base metal mining developments in the region
|
Wiessner, A. (1998). The treatment of a deposited lignite pyrolysis wastewater by adsorption using activated carbon and activated coke. Colloids and Surfaces a-Physicochemical and Engineering Aspects, 139(1), 91–97.
Abstract: To study the functions of activated carbon and activated coke adsorption for the treatment of highly contaminated discolored industrial wastewater with a wide molecular size distribution of organic compounds, the deposited lignite pyrolysis wastewater from a filled open-cast coal mine was used for continuous and discontinuous experiments.
|
Gusek, J. J. (2005). Design challenges for large scale sulfate reducing bioreactors. Contaminated Soils, Sediments and Water: Science in the Real World, Vol 9, 9, 33–44.
Abstract: The first large-scale (1,200 gpm capacity), sulfate-reducing; bioreactor (SRBR) was constructed in 1996 to treat water from an underground lead mine in Missouri. Other large-scale SRBR systems have been built elsewhere since then. This technology holds much promise for economically treating heavy metals and has progressed steadily from the laboratory to industrial applications. Scale-up challenges include: designing for seasonal temperature variations, minimizing short circuits, changes in metal loading rate s, storm water impacts, and resistance to vandalism. However, the biggest challenge may be designing for the progressive biological degradation of the organic substrate and its effects on the hydraulics of the SRBR cells.
|
Schoeman, J. J., & Steyn, A. (2001). Investigation into alternative water treatment technologies for the treatment of underground mine water discharged by Grootvlei Proprietary Mines Ltd into the Blesbokspruit in South Africa. Desalination, 133(1), 13–30.
Abstract: Grootvlei Proprietary Mines Ltd is discharging between 80 and 100 Ml/d underground water into the Blesbokspruit. This water is pumped out of the mine to keep the underground water at such a level as to make mining possible. The water is of poor quality because it contains high TDS levels (2700-3800 mg/l) including high concentrations of iron, manganese, sulphate, calcium, magnesium, sodium and chloride. This water will adversely affect the water ecology in the Blesbokspruit, and it will significantly increase the TDS concentration of one of the major water resources if not treated prior to disposal into the stream. Therefore, alternative water desalination technologies were evaluated to estimate performance and the economics of the processes for treatment of the mine water. It was predicted that water of potable quality should be produced from the mine water with spiral reverse osmosis (SRO). It was demonstrated that it should be possible to reduce the TDS of the mine water (2000-2700-3400-4500 mg/l) to potable standards with SRO (85% water recovery). The capital costs (pretreatment and desalination) for a 80 Ml/d plant (worst-case water) were estimated at US$35M. Total operating costs were estimated at 88.1c/kl. Brine disposal costs were estimated at US$18M. Therefore, the total capital costs are estimated at US$53M. It was predicted that it should be possible to produce potable water from the worst-case feed water (80 Ml/d) with the EDR process. It was demonstrated that the TDS in the feed could be reduced from 4178 to 246 mg/l in the EDR product (65% water recovery). The capital costs (pretreatment plus desalination) to desalinate the worst-case feed water to potable quality with EDR is estimated at US$53.3M. The operational costs are estimated at 47.6 c/kl. Brine disposal costs were estimated at US$42M. Therefore, the total capital costs are estimated at US$95.3 M. It was predicted that it should be possible to produce potable water from the mine water with the GYP-CIX ion- exchange process. It was demonstrated that the feed TDS (2000- 4500 mg/l) could be reduced to less than 240 mg/l (54% water recovery for the worst-case water). The capital cost for an 80 Ml/d ion-exchange plant (worst-case water) was estimated at US$26.7M (no pretreatment). Operational costs were estimated at 60.4 c/kl. Brine disposal costs were estimated at US$55.1M. Therefore, the total desalination costs were estimated at US$81.8M. The capital outlay for a SRO plant will be significantly less than that for either an EDR or a GYP-CIX plant. The operating costs, however, of the RO plant are significantly higher than for the other two processes. Potable water sales, however, will bring more in for the RO process than for the other two processes because a higher water recovery can be obtained with RO. The operating costs minus the savings in water sales were estimated at 17.2; 6.7 and US$8.6M/y for the RO, EDR and GYP-CIX processes, respectively (worst case). Therefore, the operational costs of the EDR and GYP-CIX processes are the lowest if the sale of water is taken into consideration. This may favour the EDR and GYP-CIX processes for the desalination of the mine water.
|
Masarczyk, J., Hansson, C. H., Solomon, R. L., & Hallmans, B. (1989). Desalination Plant at Kwk-debiensko, Poland – Advanced Mine Drainage Water-treatment Engineering for Zero Discharge. Desalination, 75(1-3), 259–287.
Abstract: The river water in Poland has, to a great extent, such a high salinity that it cannot be used as drinking water, agricultural or industrial water. A large environmental project is now under progress in Katowice, Poland, in order to eliminate the wastewater discharge from two coal mines — Debiensko and Budryk. The highly brackish water will be desalinated in a reverse osmosis plant, followed by vapor compression distillation with seed crystals (RCC), crystallization and sodium chloride drying. This zero discharge process will produce about 8,000 m3/d drinking water an 370 tonnes/d NaCl. The paper describes the design of the plant. Trial operation of pre-treatment and reverse osmosis in a pilot plant for design of the full-scale plant at Debiensko is described in a separate paper.
|