|
Rees, B., Bowell, R., Dey, M., & Williams, K. (2001). Passive treatment; a walk away solution? Mining Environmental Management, 9(2), 7–8.
|
|
|
Brown, A. (1995). Geohydrology and adit plugging. In H. H. Posey, J. A. Pendleton, & D. J. A. Van Zyl (Eds.), Special Publication – Colorado Geological Survey, Report: 38 (pp. 87–98). Proceedings; Summitville forum '95.
|
|
|
St-Arnaud, L. C. (1994). Water covers for the decommissioning of sulfidic mine tailings impoundments. In Special Publication – United States. Bureau of Mines, Report: BUMINES-SP-06A-94 (pp. 279–287). Proceedings of the International land reclamation and mine drainage conference and Third international conference on The abatement of acidic drainage; Volume 1 of 4; Mine drainage.
|
|
|
Calabrese, J. P., Sexstone, A. J., Bhumbla, D. K., Skousen, J. G., Bissonnette, G. K., & Sencindiver, J. C. (1994). Long-term study of constructed model wetlands for treatment of acid mine drainage. In Special Publication – United States. Bureau of Mines, Report: BUMINES-SP-06B-94 (406). Proceedings of the International land reclamation and mine drainage conference and Third international conference on The abatement of acidic drainage; Volume 2 of 4; Mine drainage.
|
|
|
Berthelot, D., & Haggis, M. (1999). Application of remote monitoring and data management systems to environmental management of tailings facilities. In D. Goldsack, N. Belzile, P. Yearwood, & G. Hall (Eds.), Sudbury '99; Mining and the environment II; conference proceedings.
Abstract: The mining industry has made tremendous strides in the last 20 years in the prevention and control of acid mine drainage. However, there remain a number of circumstances where the long-term operation, care and maintenance of tailings management facilities will be required. The application of progressive environmental technologies and management systems is key to cost control and environmental liability management at these sites. Mine Waste Management Inc. currently operates Rio Algom Limited's five effluent treatment plants and seven waste management areas in the Elliot Lake, Ontario region using a Remote Plant Monitoring and Control Network (RPMCN). This system, based on Intellutions's “Fix 32” technology, enables the monitoring and control of these plants from a centralized location thus reducing labour costs while providing 24-hour surveillance. Scheduling, auditing and reporting of plant operating and environmental monitoring programs are integrated and controlled using the Envista (super TM) environmental information management system. Proper application of these technologies and management systems facilitates delivery of cost-effective environmental monitoring, and care and maintenance programs at these sites and provides tools to demonstrate compliance with all environmental performance criteria.
|
|