Smyth, D., Blowes, D., Ptacek, C., & Bain, J. (2004). Application of permeable reactive barriers for treating mine drainage and dissolved metals in groundwater. Geotechnical News, 22(1), 39–44.
|
Benner, S. G., Blowes, D. W., & Ptacek, C. J. (1997). A full-scale porous reactive wall for prevention of acid mine drainage. Ground Water Monitoring and Remediation, 17(4), 99–107.
Abstract: The generation and release of acidic drainage containing high concentrations of dissolved metals from decommissioned mine wastes is an environmental problem of international scale. A potential solution to many acid drainage problem is the installation of permeable reactive walls into aquifers affected by drainage water derived from mine waste materials. A permeable reactive wall installed into an aquifer impacted by low-quality mine drainage waters was installed in August 1995 at the Nickel Rim mine site near Sudbury, Ontario. The reactive mixture, containing organic matter, was designed to promote bacterially mediated sulfate reduction and subsequent metal sulfide precipitation. The reactive wall is installed to an average depth of 12 feet (3.6 m) and is 49 feet (15 m) long perpendicular to ground water flow. The wall thickness (flow path length) is 13 feet (4 m). Initial results, collected nine months after installation, indicate that sulfate reduction and metal sulfide precipitation is occurring. Comparing water entering the wall to treated water existing the wall, sulfate concentrations decrease from 2400 to 4600 mg/L to 200 to 3600 mg/L; Fe concentration decrease from 250 to 1300 mg/L to 1.0 to 40 mg/L, pH increases from 5.8 to 7.0; and alkalinity (as CaCO<inf>3</inf>) increases from 0 to 50 mg/L to 600 to 2000 mg/L. The reactive wall has effectively removed the capacity of the ground water to generate acidity on discharge to the surface. Calculations based on comparison to previously run laboratory column experiments indicate that the reactive wall has potential to remain effective for at least 15 years.
|
Wiseman, I. M., Rutt, G. P., & Edwards, P. J. (2004). Constructed wetlands for minewater treatment: Environmental benefits and ecological recovery. Water and Environment Journal, 18(3), 133–138.
Abstract: The ecology of the River Pelenna (in South Wales) was impoverished by polluted discharges from abandoned coal mines. A series of passive constructed wetlands was created in order to treat these discharges and to improve the ecology of the river. A three-year Environment Agency R&D project investigated the performance, environmental benefits and sustainability of the constructed wetlands. It showed that the treatment systems were removing most of the iron contamination. In the reaches downstream from the minewaters, the dissolved-iron concentration quickly dropped below the target level. Invertebrate abundance, trout and riverine bird populations increased in following years. However, occasional overflows from the systems have significantly affected the ecology of one stretch of river The research work has provided an insight into the potential for ecological recovery associated with future minewater treatment.
|
Wingenfelder, U., Hansen, C., Furrer, G., & Schulin, R. (2005). Removal of heavy metals from mine waters by natural zeolites. Environ Sci Technol, ES & T, 39(12), 4606–4613.
|
Fisher, T. S. R., & Lawrence, G. A. (2006). Treatment of acid rock drainage in a meromictic mine pit lake. Journal of environmental engineering, 132(4), 515–526.
Abstract: The Island Copper Mine pit near Port Hardy, Vancouver Island, B.C., Canada, was flooded in 1996 with seawater and capped with fresh water to form a meromictic (permanently stratified) pit lake of maximum depth 350 m and surface area 1.72 km2. The pit lake is being developed as a treatment system for acid rock drainage. The physical structure and water quality has developed into three distinct layers: a brackish and well-mixed upper layer; a plume stirred intermediate layer; and a thermally convecting lower layer. Concentrations of dissolved metals have been maintained well below permit limits by fertilization of the surface waters. The initial mine closure plan proposed removal of heavy metals by metal-sulfide precipitation via anaerobic sulfate-reducing bacteria, once anoxic conditions were established in the intermediate and lower layers. Anoxia has been achieved in the lower layer, but oxygen consumption rates have been less than initially predicted, and anoxia has yet to be achieved in the intermediate layer. If anoxia can be permanently established in the intermediate layer then biogeochemical removal rates may be high enough that fertilization may no longer be necessary. < copyright > 2006 ASCE.
|