|
Dunn, J., Russell, C., & Morrissey, A. (1999). Remediating historic mine sites in Colorado. Min. Eng., 51(8), 32–35.
Abstract: This article provides examples of reclamation and remediation in Colorado watersheds. The projects were undertaken by the US Environmental Protection Agency (EPA) Region 8, in cooperation with the Colorado Division of Minerals and Geology (CDMG), Colorado Department of Public Health and Environment (CDPHE), US Forest Service (USFS), the Bureau of Land Management (BLM), Bureau of Reclamation (BOR) and the US Geological Survey (USGS). These agencies collaborated on the environmental problems at abandoned mines. These samples involved the interaction of surface and ground waters with sulfide-bearing rocks, mine workings and surface mine spoils that produce acid solutions charged with heavy metals that are toxic to organisms. In these examples, acid mine drainage from historic mines in Colorado has been approached cooperatively with stakeholders. Each example emphasizes one aspect of the three-stage process. These stages include characterization and prioritization, hydrologic controls and the evaluation of long-term remediation activities.
|
|
|
Banks, S. B., & Banks, D. (2001). Abandoned mines drainage; impact assessment and mitigation of discharges from coal mines in the UK. In R. N. Yong, & H. R. Thomas (Eds.), Geoenvironmental engineering Engineering Geology (pp. 31–37). 60.
Abstract: The UK has a legacy of pollution caused by discharges from abandoned coal mines, with the potential for further pollution by new discharges as groundwaters continue to rebound to their natural levels. In 1995, the Coal Authority initiated a scoping study of 30 gravity discharges from abandoned coal mines in England and Scotland. Mining information, geological information and water quality data were collated and interpreted in order to allow a preliminary assessment of the source and nature of each of the discharges. An assessment of the potential for remediation was made on the basis of the feasibility and relative costs of alternative remediation measures. Environmental impacts of the discharges and of the proposed remediation schemes were also assessed. The results, together with previous Coal Authority studies of discharges in Wales, were used by the Coal Authority, in collaboration with the former National Rivers Authority and the former Forth and Clyde River Purification Boards, to rank discharge sites in order of priority for remediation.
|
|
|
(1998). 'Green' company offers desalination technology. Water Sewage and Effluent, 18(4), 9–11.
Abstract: Water and wastewater treatment activities, projects and capabilities of South African environmental engineering specialist Envig are detailed. The company, as part of the Weir Wesgarth Consortium, has pre-qualified for the major Namibian Water Supply Project, one of the largest of its kind to date in southern Africa. This project involves the desalination of seawater to meet increasing water demand and shortfalls. Envig, if awarded the contract, would be involved in construction of three or four reverse osmosis or mechanical vapour compression sea water desalination plants and associated infrastructure. The company is also involved in a mine water desalination project at the Eskom Tutuka Power Station. A reverse osmosis plant using low fouling maintenance is being installed to deal with acid mine drainage water. Details of the design and operation of this plant are given.
|
|
|
Miller, S. D. (1999). Overview of acid mine drainage issues and control strategies Remediation and management of degraded lands. In M. H. Wong, J. W. C. Wong, & A. J. M. Baker (Eds.),. Boca Raton: Lewis Publishers.
|
|
|
Kingham, N. W., Semenak, R., Powell, G., & Way, S. (2002). Reverse osmosis coupled with chemical precipitation treatment of acid mine leachate at the Basin-Luttrell Pit, Ten Mile Creek Site, Lewis and Clark County, Montana Hardrock mining 2002; issues shaping the industry..
|
|