| 
Citations
 | 
   web
Tempel, R. N. (2000). A quantitative approach to optimize chemical treatment of acid drainage using geochemical reaction path modeling methods: Climax Mine, Colorado. ICARD 2000, Vols I and II, Proceedings, , 1053–1058.
toggle visibility
Zhuang, J. M. (2004). Lignor(TM) process for acidic rock drainage treatment. Environ. Technol., 25(9), 1031–1040.
toggle visibility
Sibrell, P. L. (2000). ARD remediation with limestone in a CO2 pressurized reactor. ICARD 2000, Vols I and II, Proceedings, , 1017–1026.
toggle visibility
Blowes, D. W. (1995). Treatment of mine drainage water using in situ permeable reactive walls. Sudbury '95 – Mining and the Environment, Conference Proceedings, Vols 1-3, , 979–987.
toggle visibility
Gemmell, R. P. (1981). The reclamation of acidic colliery spoil .2. The use of lime wastes. Journal of Applied Ecology, 18(3), 879–887.
toggle visibility