Jarvis, A. P. (2000). Design, construction and performance of passive systems for the treatment of mine and spoil heap drainage. Ph.D. thesis, University of Newcastle upon Tyne,, .
|
Laine, D. M., & Jarvis, A. P. (2003). Design aspects of passive in situ remediation schemes for minign & industrial effluents. Tübinger Geowissenschaftliche Arbeiten, C68, 95–113.
|
Laine, D. M., & Jarvis, A. P. (2003). Engineering design aspects of passive in situ remediation of mining effluents. Land Contam. Reclam., 11(2), 113–126.
Abstract: Passive treatment of contaminated effluents can offer a 'low cost' management opportunity to remediate drainages to the standards required by enforcement agencies. However, the initial cost of construction of passive treatment systems is significant and often in excess of that for active treatment systems. It is therefore important that the engineering design of the passive systems produces an effective and efficient scheme to enable the construction and maintenance costs to be minimised as far as possible. Possible parameters for the design of passive systems are suggested to seek to obtain uniformity in size and layout of treatment elements where this may be possible. Passive treatment systems include aeration systems, sedimentation ponds, aerobic and anaerobic wetlands, anoxic limestone drains and reducing alkalinity producing systems. Most active treatment systems also include passive elements in the treatment stream. The basic design considerations that should be considered to ensure the construction of efficient systems are discussed.
|
Jarvis, A. P. (2006). Effective remediation of grossly polluted acidic, and metal-rich, spoil heap drainage using a novel, low-cost, permeable reactive barrier in Northumberland, UK. Environmental Pollution, 143(2), 261–268.
Abstract: A permeable reactive barrier (PRB) for remediation of coal spoil heap drainage in Northumberland, UK, is described. The drainage has typical chemical characteristics of pH < 4, [acidity] > 1400 mg/L as CaCO3, [Fe] > 300 mg/L, [Mn] > 165 mg/L, [Al] > 100 mg/L and IS041 > 6500 mg/L. During 2 years of operation the PRB has typically removed 50% of the iron and 40% of the sulphate from this subsurface spoil drainage. Bacterial sulphate reduction appears to be a key process of this remediation. Treatment of the effluent from the PRB results in further attenuation; overall reductions in iron and sulphate concentrations are 95% and 67% respectively, and acidity concentration is reduced by an order of magnitude. The mechanisms of attenuation of these, and other, contaminants in the drainage are discussed. Future research and operational objectives for this novel, low-cost, treatment system are also outlined. (c) 2005 Elsevier Ltd. All rights reserved.
|
Jarvis, A. P., & Younger, P. L. (1999). Design, construction and performance of a full-scare compost wetland for mine-spoil drainage treatment at quaking houses. Jciwem, 13(5), 313–318.
Abstract: Acidic spoil-heap drainage, containing elevated concentrations of iron, aluminium and manganese, has been polluting the Stanley Burn in County Durham for nearly two decades. Following the success of a pilot-scale wetland (the first application of its kind in Europe), a full-scale wetland was installed. Waste manures and composts have been used as the main substrate which is contained within embankments constructed from compacted pulverized fuel ash. The constructed wetland, which cost less than £20,000 to build, has consistently reduced iron and aluminium concentrations and has markedly lowered the acidity of the drainage. A third phase of activities at the site aims to identify and eliminate pollutant-release 'hot spots' within the spoil.
|