Records |
Author |
Wiessner, A.; Kuschk, P.; Buddhawong, S.; Stottmeister, U.; Mattusch, J.; Kästner, M. |
Title |
Effectiveness of various small-scale constructed wetland designs for the removal of iron and zinc from acid mine drainage under field conditions |
Type |
Journal Article |
Year |
2006 |
Publication |
Engineering in Life Sciences |
Abbreviated Journal |
|
Volume |
6 |
Issue |
6 |
Pages |
584-592 |
Keywords |
Grubenentwässerung biologische-Abwasserreinigung Pflanze Zink Eisen Schwermetallentfernung Nassverfahren Grundwasserströmung Langzeitversuch Regen Prozesswirkungsgrad Reaktionsgeschwindigkeit Binsen Hydrokultur |
Abstract |
A system of planted and implanted small-scale SSF (subsurface flow) and SF (surface flow) constructed wetlands together with HP (hydroponic systems) were installed to compare the removal efficiencies of Fe and Zn from AMD (acid mine drainage) under long-term field conditions. Maximum removal of 94 % – 97 % (116 mg/m(exp 2)/d – 142 mg/m(exp 2)/d) for Fe and 69 % – 77 % (6.2 mg/m(exp 2)/d – 7.9 mg/m(exp 2)/d) for Zn was calculated for the planted soil systems. The planted SSF was most sensitive to heavy rain fall. Short-term increases of the metal concentration in the outflows, short-term breakdowns of the Fe removal and continual long-term breakdowns of the Zn removal were observed. In contrast to Zn removal, all wetland types are applicable for Fe removal with maximum removal in the range of 60 % – 98 %. Most of the removed Fe and Zn was transformed and deposited inside the soil bed. The amount absorbed by the plants (0.03 % to 0.3 %) and gravel-associated soil beds (0.03 % to 1.7 %) of the total input were low for both metals. The response of the planted SSF to rainfall suggests a remobilisation of metals accumulated inside the rhizosphere and the importance of buffering effects of the surface water layers of SF systems. The importance of plants for metal removal was shown. |
Address |
UFZ – Umweltforschungszentrum Leipzig-Halle, DE; King Mongkut's University of Technology Thonburi (KMUTT), Bangkok, TH |
Corporate Author |
|
Thesis |
|
Publisher |
|
Place of Publication |
|
Editor |
|
Language |
|
Summary Language |
|
Original Title |
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
Series Volume |
|
Series Issue |
|
Edition |
|
ISSN |
1618-0240 |
ISBN |
|
Medium |
|
Area |
|
Expedition |
|
Conference |
|
Notes |
Effectiveness of various small-scale constructed wetland designs for the removal of iron and zinc from acid mine drainage under field conditions; 39931, BERG , 08.01.07; Words: 506; 200612 02721; 9 Seiten, 7 Bilder, 3 Tabellen, 36 Quellen 3UXX *Belastung von Wasser, Wasserreinhaltung, Abwasser* 3PZI *biologischer Abbau und Bioremediation*; BERG, Copyright FIZ Technik e.V.; EN Englisch |
Approved |
no |
Call Number |
CBU @ c.wolke @ 17578 |
Serial |
211 |
Permanent link to this record |
|
|
|
Author |
Wieder, R.K. |
Title |
A survey of constructed wetlands for acid coal mine drainage treatment in the Eastern United States |
Type |
Journal Article |
Year |
1989 |
Publication |
Wetlands |
Abbreviated Journal |
|
Volume |
9 |
Issue |
2 |
Pages |
299-315 |
Keywords |
acid mine drainage; coal; Eastern U.S.; environmental geology; human activity; organic residues; Pennsylvania; pollution; reclamation; sedimentary rocks; United States; water quality; water treatment; wetlands 22 Environmental geology; 21 Hydrogeology |
Abstract |
|
Address |
|
Corporate Author |
|
Thesis |
|
Publisher |
|
Place of Publication |
|
Editor |
|
Language |
|
Summary Language |
|
Original Title |
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
Series Volume |
|
Series Issue |
|
Edition |
|
ISSN |
0277-5212 |
ISBN |
|
Medium |
|
Area |
|
Expedition |
|
Conference |
|
Notes |
A survey of constructed wetlands for acid coal mine drainage treatment in the Eastern United States; 1990-040374; Dec References: 19; illus. incl. 4 tables United States (USA); GeoRef; English |
Approved |
no |
Call Number |
CBU @ c.wolke @ 6755 |
Serial |
212 |
Permanent link to this record |
|
|
|
Author |
Whitlock, J.L. |
Title |
Biological Detoxification of Precious Metal Processing Wastewaters |
Type |
Journal Article |
Year |
1990 |
Publication |
Geomicrobiol. J. |
Abbreviated Journal |
|
Volume |
8 |
Issue |
3-4 |
Pages |
241-249 |
Keywords |
biofilm cyanide detoxification mining operation precious metals pseudomonas rotating biological contactors waste-water |
Abstract |
A biological treatment plant is utilized at the Homestake Mine in Lead, SD, to effect detoxification of a daily discharge of 4 million gallons of wastewater. The wastewater matrix requiring treatment contains cyanide, ammonia, toxic heavy metals, anda variable component of toxic chemicals associated with extractive metallurgy and mining operations. Rotating biological contactors (RBCs) are used to attach the biofilm. Cyanides and heavy metals concentrations are reduced by 95-98%. The treated discharge makes up as much as 60% of the total flow in a cold-water trout fishery. This receiving stream, which remained lifeless for over 100 years as a mine drainage, has now become an established trout fishery and recently yielded a state record trout. |
Address |
|
Corporate Author |
|
Thesis |
|
Publisher |
|
Place of Publication |
|
Editor |
|
Language |
|
Summary Language |
|
Original Title |
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
Series Volume |
|
Series Issue |
|
Edition |
|
ISSN |
0149-0451 |
ISBN |
|
Medium |
|
Area |
|
Expedition |
|
Conference |
|
Notes |
Biological Detoxification of Precious Metal Processing Wastewaters; Isi:A1990gr30500007; AMD ISI | Wolkersdorfer |
Approved |
no |
Call Number |
CBU @ c.wolke @ 17482 |
Serial |
213 |
Permanent link to this record |
|
|
|
Author |
White, R.T. |
Title |
Water-treatment Practice in South-african Gold-mines |
Type |
Journal Article |
Year |
1985 |
Publication |
J. S. Afr. Inst. Min. Metall. |
Abbreviated Journal |
|
Volume |
85 |
Issue |
3 |
Pages |
81-87 |
Keywords |
mine water |
Abstract |
|
Address |
|
Corporate Author |
|
Thesis |
|
Publisher |
|
Place of Publication |
|
Editor |
|
Language |
|
Summary Language |
|
Original Title |
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
Series Volume |
|
Series Issue |
|
Edition |
|
ISSN |
0038-223x |
ISBN |
|
Medium |
|
Area |
|
Expedition |
|
Conference |
|
Notes |
Water-treatment Practice in South-african Gold-mines; Isi:A1985akk0500002; AMD ISI | Wolkersdorfer |
Approved |
no |
Call Number |
CBU @ c.wolke @ 9957 |
Serial |
214 |
Permanent link to this record |
|
|
|
Author |
Weeks, R.E.; Krohn, R.; Walker, T.H. |
Title |
Water management during the Pinto Valley removal action |
Type |
Conference Article |
Year |
2000 |
Publication |
Tailings and Mine and Waste 2000, Proceedings of the Seventh International Conference, Fort Collins, US, Jan 22 26, 2000 |
Abbreviated Journal |
|
Volume |
|
Issue |
|
Pages |
499-506 |
Keywords |
Bergbau Erzbergbau Erzaufbereitung Damm Gewässerschutz Umweltschutz Grundwasser Rekultivierung Versatzgut Abtragen Niederschlag=Atmosphäre Dammbruch Wassermanagement |
Abstract |
Der Bruch des Dammes einer Halde der Grube Nr. 14 des Kupfer- Bergbaubetriebes Pinto Valley in Arizona, USA, im Jahre 1997 führte zum Eintrag von 370000 yd(exp 3) Bergematerials und Tailings in das Bett des Flusses Pinto Creek, USA, wodurch letzteres blockiert wurde. Der Vorfall ereignete sich in bergigem Gelände unterhalb eines 14 Quadratmeilen großen Abschnittes des Flusseinzugsgebietes oberhalb des Sees Roosevelt Lake, USA, einer Trinkwasserquelle für Phoenix, USA. Aufgrund der Bedeutung des Gebietes wurde eine Strategie zur Verhütung weiterer Beeinträchtigungen der Wasserqualität ausgearbeitet. Diese beinhaltete Managementaspekte zur Gewährleistung einer schnellen Planung und Ausführung der notwendigen Arbeiten gekoppelt mit der Planung, dem Bau und dem Betrieb von Rückhalte und Umleitungssystemen für auftretende Wässer. Die Auslegung dieser Systeme erfolgte auf der Grundlage der Daten des Einzugsgebietes und der klimatischen Verhältnisse, wobei verschiedene Wahrscheinlichkeiten der Überschreitung der ermittelten Werte berücksichtigt wurden. Innerhalb von acht Monaten konnten die Tailings aus dem betroffenen Gebiet entfernt werden, ohne dass belastete Oberflächenwässer freigesetzt wurden. |
Address |
Golder Associates, Phoenix, US; BHP Copper, Miami, US; AGRA Earth & Environmental, Phoenix, US |
Corporate Author |
|
Thesis |
|
Publisher |
|
Place of Publication |
|
Editor |
|
Language |
|
Summary Language |
|
Original Title |
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
Series Volume |
|
Series Issue |
|
Edition |
|
ISSN |
|
ISBN |
|
Medium |
|
Area |
|
Expedition |
|
Conference |
|
Notes |
Water management during the Pinto Valley removal action; BERG, Copyright FIZ Technik e.V.; EN Englisch; 90-5809-126-0; 200007 03261; 22520, BERG , 25.09.00; Words: 374; 8 Seiten, 1 Bild, 3 Quellen 3MZ *Bergbau, Tunnelbau, Erdöl /Erdgasförderung, Bohrtechnik* 3UX *Umweltbelastung, technik* |
Approved |
no |
Call Number |
CBU @ c.wolke @ 17593 |
Serial |
215 |
Permanent link to this record |