Records |
Author |
Beck, P. |
Title |
CL:AIRE – Providing support for remediation research |
Type |
Journal Article |
Year |
2003 |
Publication |
Land Contam. Reclam. |
Abbreviated Journal |
|
Volume |
11 |
Issue |
2 |
Pages |
99-104 |
Keywords |
Groundwater problems and environmental effects Pollution and waste management non radioactive geomechanics abstracts: excavations (77 10 10) geological abstracts: environmental geology (72 14 2) contaminated land remediation guideline acid mine drainage hydrochemistry |
Abstract |
CL:AIRE (Contaminated Land: Applications in Real Environments) is a public-private partnership which was established in 1999 to encourage the demonstration of remediation research and technologies on contaminated sites throughout the UK. Project proposals are submitted to CL:AIRE and reviewed and approved by the CL:AIRE Technology & Research Group. CL:AIRE provides independent verification of its projects and plays a crucial role in the dissemination of project information. During the course of the project, progress is reported through the newsletter, CL:AIRE view, which is mailed free of charge to a database of more than 4500 stakeholders with an interest in contaminated land. Progress is also tracked on the CL:AIRE website at www.claire.co.uk. On completion of the project, a project report is published and a one page summary fact sheet is prepared. The fact sheet is distributed to our database subscribers and posted on the website. The project is also presented at the CL:AIRE Annual Project Conference. In addition, aspects of the research which have practical application will be published as CL:AIRE Research Bulletins. Acid mine waters discharging from abandoned mines represent a significant environmental problem in many parts of the UK. Considerable research has been carried out to understand the geochemical process involved, and the knowledge has been used to manage groundwater discharge through physical/chemical treatment and constructed wetlands. CL:AIRE supports the development of a national site for wetland research managed by the University of Newcastle and will encourage collaborative research projects to be submitted through CL:AIRE. CL:AIRE is currently supporting two projects which demonstrate remediation of acid mine drainage and is disseminating the results of this and other research to improve confidence in the use of these techniques. |
Address |
P. Beck, CL:AIRE, 1 Great Cumberland Place, London W1H 7AL, United Kingdom |
Corporate Author |
|
Thesis |
|
Publisher |
|
Place of Publication |
|
Editor |
|
Language |
|
Summary Language |
|
Original Title |
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
Series Volume |
|
Series Issue |
|
Edition |
|
ISSN |
0967-0513 |
ISBN |
|
Medium |
|
Area |
|
Expedition |
|
Conference |
|
Notes |
CL:AIRE – Providing support for remediation research; 2530414; United-Kingdom 2; Geobase |
Approved |
no |
Call Number |
CBU @ c.wolke @ 17524 |
Serial |
461 |
Permanent link to this record |
|
|
|
Author |
Adam, K. |
Title |
Solid wastes management in sulphide mines: From waste characterisation to safe closure of disposal sites |
Type |
Journal Article |
Year |
2003 |
Publication |
Minerals and Energy Raw Materials Report |
Abbreviated Journal |
|
Volume |
18 |
Issue |
4 |
Pages |
25-35 |
Keywords |
Waste Management and Pollution Policy Pollution and waste management non radioactive geographical abstracts: human geography environmental planning (70 11 5) geological abstracts: environmental geology (72 14 2) waste disposal waste management solid waste mining industry acid mine drainage Europe Eurasia |
Abstract |
Environmentally compatible Waste Management schemes employed by the European extractive industry for the development of new projects, and applied in operating sulphide mines, are presented in this study. Standard methodologies used to assess the geotechnical and geochemical properties of the solid wastes stemming from mining and processing of sulphidic metal ores are firstly given. Based on waste properties, the measures applied to ensure the environmentally safe recycling and disposal of sulphidic wastes are summarised. Emphasis is given on the novel techniques developed to effectively prevent and mitigate the acid drainage phenomenon from sulphidic mine wastes and tailings. Remediation measures taken to minimise the impact from waste disposal sites in the post-closure period are described. |
Address |
K. Adam, ECHMES Ltd, Mikras Asias 40-42, Athens 11527, Greece echmes@otenet.gr |
Corporate Author |
|
Thesis |
|
Publisher |
|
Place of Publication |
|
Editor |
|
Language |
|
Summary Language |
|
Original Title |
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
Series Volume |
|
Series Issue |
|
Edition |
|
ISSN |
1404-1049 |
ISBN |
|
Medium |
|
Area |
|
Expedition |
|
Conference |
|
Notes |
Solid wastes management in sulphide mines: From waste characterisation to safe closure of disposal sites; 2582509; Norway 25; Geobase |
Approved |
no |
Call Number |
CBU @ c.wolke @ 17510 |
Serial |
492 |
Permanent link to this record |
|
|
|
Author |
Zinck, J.M.; Aube, B.C. |
Title |
Optimization of lime treatment processes |
Type |
Journal Article |
Year |
2000 |
Publication |
CIM Bull. |
Abbreviated Journal |
|
Volume |
93 |
Issue |
1043 |
Pages |
98-105 |
Keywords |
Pollution and waste management non radioactive Groundwater problems and environmental effects geological abstracts: environmental geology (72 14 2) geomechanics abstracts: excavations (77 10 10) acid mine drainage buffering lime Canada |
Abstract |
Lime neutralization technology is widely used in Canada for the treatment of acid mine drainage and other acidic effluents. In many locations, improvements to the lime neutralization process are necessary to achieve a maximum level of sludge densification and stability. Conventional lime neutralization technology effectively removes dissolved metals to below regulated limits. However, the metal hydroxide and gypsum sludge generated is voluminous and often contains less than 5% solids. Despite recent improvements in the lime neutralization technology, each year, more than 6 700 000 m3 of sludge are generated by treatment facilities operated by the Canadian mining industry. Because lime neutralization is still seen as the best available approach for some sites, sludge production and stability are expected to remain as issues in the near future. Several treatment parameters significantly impact operating costs, effluent quality, sludge production and the geochemical stability of the sludge. Studies conducted both at CANMET and NTC have shown that through minor modifications to the treatment process, plant operators can experience a reduction in operating costs, volume of sludge generated, metal release to the environment and liability. This paper discusses how modifications in plant operation and design can reduce treatment costs and liability associated with lime treatment. |
Address |
J.M. Zinck, CANMET, Mining and Mineral Sciences Lab., Natural Resources Canada, Ottawa, Ont., Canada |
Corporate Author |
|
Thesis |
|
Publisher |
|
Place of Publication |
|
Editor |
|
Language |
|
Summary Language |
|
Original Title |
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
Series Volume |
|
Series Issue |
|
Edition |
|
ISSN |
0317-0926 |
ISBN |
|
Medium |
|
Area |
|
Expedition |
|
Conference |
|
Notes |
Optimization of lime treatment processes; 2291672; Canada 17; Geobase |
Approved |
no |
Call Number |
CBU @ c.wolke @ 17537 |
Serial |
183 |
Permanent link to this record |
|
|
|
Author |
Smith, I.J.H. |
Title |
AMD treatment, it works but are we using the right equipment? |
Type |
Journal Article |
Year |
2000 |
Publication |
Tailings and mine waste ' |
Abbreviated Journal |
|
Volume |
|
Issue |
|
Pages |
419-427 |
Keywords |
Groundwater problems and environmental effects geomechanics abstracts: excavations (77 10 10) acid mine drainage conference proceedings methodology mine drainage remediation waste management |
Abstract |
For the past 40 years various approaches have been developed to treat acid waters coming from abandoned as well as operating mining operations. System designs have evolved to meet increasingly stringent discharge permit limits for treated water, as well as to provide solid disposal within economic constraints. A treatment system for remediation of acid mine drainage (AMD) or acid groundwater (AG) requires two main steps: 1. The addition of chemicals to precipitate dissolved metals contained in the waters, and if necessary, to coagulate the precipitated solids ahead of physical separation. 2. Physical separation of the precipitated solids from the water so the water can be lawfully discharged from the site. Choosing the appropriate technology and equipment results in the most efficient plant design, the lowest capital outlay, and minimum operating cost. The goal of these plants is to discharge liquids and solids able to meet standards. The separation of solids from liquids can be achieved through various means, including gravity settling, flotation, mechanical dewatering, filtration and evaporation. As important as the liquid solids separation unit operations are, they are driven by the chemistry of the water to be treated. The content of the dissolved solids will influence the quality and quantity of the solids produced during precipitation. Thus the two aspects must be integrated, with chemistry first, then mechanical engineering. This presentation will provide an overview of a number of liquid solids separation tools currently being used to treat AMD-AG at several sites in the USA. It will also discuss how their operations are impacted by the chemistry of their particular acid water feeds. The tools used include clarifier-thickeners, solids contact clarifiers, dissolved air flotation, polishing filters, membrane filters, and mechanical dewatering devices (belt and filter presses, vacuum filters, and driers). |
Address |
J.H. Smith III, SEPCO Incorporated, Fort Collins, CO, United States |
Corporate Author |
|
Thesis |
|
Publisher |
|
Place of Publication |
|
Editor |
|
Language |
|
Summary Language |
|
Original Title |
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
Series Volume |
|
Series Issue |
|
Edition |
|
ISSN |
|
ISBN |
|
Medium |
|
Area |
|
Expedition |
|
Conference |
|
Notes |
Book; Conference-Paper; AMD treatment, it works but are we using the right equipment?; 2263351; Using Smart Source Parsing 00-Proceedings-of-the-7th-international-conference-Fort-Collins-January- 2000 Netherlands; Geobase |
Approved |
no |
Call Number |
CBU @ c.wolke @ 17541 |
Serial |
237 |
Permanent link to this record |
|
|
|
Author |
Dunn, J.; Russell, C.; Morrissey, A. |
Title |
Remediating historic mine sites in Colorado |
Type |
Journal Article |
Year |
1999 |
Publication |
Min. Eng. |
Abbreviated Journal |
|
Volume |
51 |
Issue |
8 |
Pages |
32-35 |
Keywords |
Reclamation and conservation Groundwater problems and environmental effects geological abstracts: environmental geology (72 14 1) geomechanics abstracts: excavations (77 10 10) abandoned mine acid mine drainage environmental effect remediation United States Colorado |
Abstract |
This article provides examples of reclamation and remediation in Colorado watersheds. The projects were undertaken by the US Environmental Protection Agency (EPA) Region 8, in cooperation with the Colorado Division of Minerals and Geology (CDMG), Colorado Department of Public Health and Environment (CDPHE), US Forest Service (USFS), the Bureau of Land Management (BLM), Bureau of Reclamation (BOR) and the US Geological Survey (USGS). These agencies collaborated on the environmental problems at abandoned mines. These samples involved the interaction of surface and ground waters with sulfide-bearing rocks, mine workings and surface mine spoils that produce acid solutions charged with heavy metals that are toxic to organisms. In these examples, acid mine drainage from historic mines in Colorado has been approached cooperatively with stakeholders. Each example emphasizes one aspect of the three-stage process. These stages include characterization and prioritization, hydrologic controls and the evaluation of long-term remediation activities. |
Address |
J. Dunn, US Environmental Protection Agency, Region 8, 999 18(th) St., Suite 500, Denver, CO 80202-2466, United States |
Corporate Author |
|
Thesis |
|
Publisher |
|
Place of Publication |
|
Editor |
|
Language |
|
Summary Language |
|
Original Title |
|
Series Editor |
|
Series Title |
|
Abbreviated Series Title |
|
Series Volume |
|
Series Issue |
|
Edition |
|
ISSN |
0026-5187 |
ISBN |
|
Medium |
|
Area |
|
Expedition |
|
Conference |
|
Notes |
Remediating historic mine sites in Colorado; 0434641; United-States; Geobase |
Approved |
no |
Call Number |
CBU @ c.wolke @ 17547 |
Serial |
398 |
Permanent link to this record |