Home | << 1 >> |
Record | |||||
---|---|---|---|---|---|
Author | Jarvis, A.P.; Younger, P.L. | ||||
Title | Design, construction and performance of a full-scare compost wetland for mine-spoil drainage treatment at quaking houses | Type | Journal Article | ||
Year | 1999 | Publication | Jciwem | Abbreviated Journal | |
Volume | 13 | Issue | 5 | Pages | 313-318 |
Keywords | Wetlands and estuaries geographical abstracts: physical geography hydrology (71 6 8) composting constructed wetland design performance assessment United Kingdom EnglandCounty Durham | ||||
Abstract | Acidic spoil-heap drainage, containing elevated concentrations of iron, aluminium and manganese, has been polluting the Stanley Burn in County Durham for nearly two decades. Following the success of a pilot-scale wetland (the first application of its kind in Europe), a full-scale wetland was installed. Waste manures and composts have been used as the main substrate which is contained within embankments constructed from compacted pulverized fuel ash. The constructed wetland, which cost less than £20,000 to build, has consistently reduced iron and aluminium concentrations and has markedly lowered the acidity of the drainage. A third phase of activities at the site aims to identify and eliminate pollutant-release 'hot spots' within the spoil. | ||||
Address | |||||
Corporate Author | Thesis | ||||
Publisher | Place of Publication | Editor | |||
Language | Summary Language | Original Title | |||
Series Editor | Series Title | Abbreviated Series Title | |||
Series Volume | Series Issue | Edition | |||
ISSN | 0951-7359 | ISBN | Medium | ||
Area | Expedition | Conference | |||
Notes | Design, construction and performance of a full-scare compost wetland for mine-spoil drainage treatment at quaking houses; 2227678; United-Kingdom 9; Geobase | Approved | no | ||
Call Number | CBU @ c.wolke @ 17546 | Serial | 339 | ||
Permanent link to this record |