|
Younger, P. L. (1998). (L. Nel Petrus Johannes, Ed.). Mine Water and Environmental Impacts. 2: Proceedings International Mine Water Association Symposium.
|
|
|
Younger, P. L. (1997). Minewater treatment using wetlands. Water and Environment Manager, 2(4), 11.
Abstract: Experiences gained by the UK Mining Industry and effluent treatment companies in theuse of wetlands for treating minewaters are discussed. Discharges from abandoned mines is a major cause of freshwater pollution in some regions. Key topics relating to the use of wetlands for minewater treatment will be discussed at a CIWEM conference in Newcastle on 5 September 1997.
|
|
|
Wolkersdorfer, C., & Younger, P. L. (2002). Passive mine water treatment as an alternative to active systems. Grundwasser, 7(2), 67–77.
Abstract: For the treatment of contaminated mine waters reliable treatment methods with low investment and operational costs are essential. Therefore, passive treatment systems recently have been installed in Great Britain and in Germany (e.g. anoxic limestone drains, constructed wetlands, reactive barriers, roughing filters) and during the last eight years such systems successfully treated mine waters, using up to 6 ha of space. In some cases with highly contaminated mine water, a combination of active and passive systems should be applied, as in any case the water quality has to reach the limits. Because not all the processes of passive treatment systems are understood in detail, current research projects (e.g. EU-project PIRAMID) were established to clarify open questions.
|
|
|
Sapsford, D., Barnes, A., Dey, M., Williams, K., Jarvis, A., & Younger, P. (2007). (R. Cidu, & F. Frau, Eds.). Water in Mining Environments. Cagliari: Mako Edizioni.
Abstract: This paper presents iron removal data from a novel low footprint mine water treatment system. The paper discusses possible design configurations and demonstrates that the system could treat 1 L/s of mine water containing 8.4 mg/L of iron to < 1 mg/L with a system footprint of 66 m2. A conventional lagoon and aerobic wetland system would require at least 160 m2 to achieve the same treatment. Other advantages of the system are that it produces a clean and dense sludge amenable to on-site storage and possible recycling and that heavy plant will generally not be required for construction.
|
|
|
Jarvis, A. P., & Younger, P. L. (1999). Design, construction and performance of a full-scare compost wetland for mine-spoil drainage treatment at quaking houses. Jciwem, 13(5), 313–318.
Abstract: Acidic spoil-heap drainage, containing elevated concentrations of iron, aluminium and manganese, has been polluting the Stanley Burn in County Durham for nearly two decades. Following the success of a pilot-scale wetland (the first application of its kind in Europe), a full-scale wetland was installed. Waste manures and composts have been used as the main substrate which is contained within embankments constructed from compacted pulverized fuel ash. The constructed wetland, which cost less than £20,000 to build, has consistently reduced iron and aluminium concentrations and has markedly lowered the acidity of the drainage. A third phase of activities at the site aims to identify and eliminate pollutant-release 'hot spots' within the spoil.
|
|